EasyManua.ls Logo

Eaton Powerware 5125 - Installing the Rail Kit

Eaton Powerware 5125
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications S 164201698 Rev 1
21
8. If optional EBMs are installed, see “Configuration Mode” on
page 30 to specify the number of EBMs installed.
NOTE The batteries charge to 80% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 48 hours after installation or long-term storage.
If you have questions about implementing non- or dual-redundant power,
the following options are available:
S View the circuit diagrams at www.powerware.com/ibm and select
Products > 9910 UPS for System i > E65 > Product Literature
S Submit your question to “Ask the Expert” at
www.powerware.com/ibm/
S Submit your question to our FAQ database at
www.powerware.com/Iibm and select General Knowledge >
Frequently Asked Questions
S Contact the IBM office or Business Partner servicing your account
Table 8. Typical Power Connections (Figure 18–Figure 20)
Item Description
1 NEMA L6-30R
2 NEMA L6-30P
3 IEC 320-C13
4 IEC 320-C19/C20
5 Burndy
®
UTG Connector
6 Country-specific UPS power (mains) cord
IBM FC Plug Type Supplier Description
1420 12 IBM NEMA L6-30P, 4.3m/14 ft
1421 12 IBM NEMA L6-30P, 1.8m/6 ft
1422 40 IBM RS 3750, 1.8m/6 ft
1423 40 IBM RS 3750, 4.3m/14 ft
1424 46 IBM IEC-309 (P+N+G) 32A, 4.3m/14 ft
1425 KP IBM KP, 4.3m/14 ft
1426 PDL IBM PDL, 4.3m/14 ft
1427 PDL IBM PDL-NZ, 4.3m/14 ft

Other manuals for Eaton Powerware 5125

Related product manuals