INSTALLATION
EATON Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications S 164201698 Rev 1
21
8. If optional EBMs are installed, see “Configuration Mode” on
page 30 to specify the number of EBMs installed.
NOTE The batteries charge to 80% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 48 hours after installation or long-term storage.
If you have questions about implementing non- or dual-redundant power,
the following options are available:
S View the circuit diagrams at www.powerware.com/ibm and select
Products > 9910 UPS for System i > E65 > Product Literature
S Submit your question to “Ask the Expert” at
www.powerware.com/ibm/
S Submit your question to our FAQ database at
www.powerware.com/Iibm and select General Knowledge >
Frequently Asked Questions
S Contact the IBM office or Business Partner servicing your account
Table 8. Typical Power Connections (Figure 18–Figure 20)
Item Description
1 NEMA L6-30R
2 NEMA L6-30P
3 IEC 320-C13
4 IEC 320-C19/C20
5 Burndy
®
UTG Connector
6 Country-specific UPS power (mains) cord
IBM FC Plug Type Supplier Description
1420 12 IBM NEMA L6-30P, 4.3m/14 ft
1421 12 IBM NEMA L6-30P, 1.8m/6 ft
1422 40 IBM RS 3750, 1.8m/6 ft
1423 40 IBM RS 3750, 4.3m/14 ft
1424 46 IBM IEC-309 (P+N+G) 32A, 4.3m/14 ft
1425 KP IBM KP, 4.3m/14 ft
1426 PDL IBM PDL, 4.3m/14 ft
1427 PDL IBM PDL-NZ, 4.3m/14 ft