INSTALLATION
Eaton 9135 Two-in-One UPS (5000/6000 VA) User's Guide S 164201726 Rev 3 www.eaton.com/powerquality
27
6. Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 7).
7. Select the proper holes in the rail for positioning the UPS in the
desired location in the rack.
8. Using two M6 12 mm flat-head screws, attach the rail to the rear
of the rack.
9. Secure the rail to the front of the rack with two M6
12 mm
screws.
10. Repeat Steps 8 and 9 for the other rail.
Figure 7. Installing the Rails