INSTALLATION
Eaton 9135 Two-in-One UPS (5000/6000 VA) User's Guide S 164201726 Rev 3 www.eaton.com/powerquality
28
11. Optional. Install the rear hold-down brackets (included with the rail
kit) if you need to move the rack enclosure with the UPS already
rack-mounted inside (see Figure 8).
Figure 8. Installing the Rear Hold-Down Brackets
12. Slide the UPS and any optional EBMs into the rack.
13. Secure the front of the cabinet to the rack using two M6
12 mm
round-head screws on each side (see Figure 9).
Figure 9. Installing the Cabinets