Chapter 3
Installation
Copyright © 2008 Eaton Corporation. All Rights Reserved.
IPN 997-00012-56C September 2008
13
Chapter 3
Installation
Overview
Topic Page
Installation Tasks 14
Task 1 - Check the AC Supply 14
Task 2 - Customize EPS2/EPS5 15
Task 3 - Mount the EPS2/EPS5 in the Rack 18
Task 4 - Connect the Output Cables 21
Task 5 - Install the Batteries Modules (if required) 23
Task 6 - Mount the Battery Temperature Sensor (if required) 26
Task 7 - Connect communications cable (if required) 26
Task 8 - Connect to the AC Supply Point 28
Installation Completed 28