Step 5 - Connect Output Positive to Ground
Ignore this Step if the dc output of the EPS2/EPS5 is "floating" (see
previous Step)
If the equipment to be powered requires that the dc output positive must be
bonded to ground, then:
1 Leave the output-ground screw in place.
2 If the building is fitted with a telecom ground bar (usually only at
telecom communications installations) then also:
Connect a telecom ground link cable from the telecom ground
terminal to the telecom ground bar ( as shown in the following
diagram).
Use:
Wire: Multi-strand, copper conductor, 1 AWG
with green/yellow insulation
Strip length: 5/8" (16mm)
Crimp lug: FCI-Burndy type YAV1C-L1
Crimp tool: FCI-Burndy type MY29-11 (Die index 42)
Tighten terminal to 20 in-lb (2.3Nm).
"
Output-ground screw in place for output
positive connected to ground.
#
Telecom ground link cable to the
telecom ground bar (if required).
Procedure complete
Task 4 - Connect the Output Cables
Step 1 - Remover the dc terminal cover

Table of Contents