EasyManua.ls Logo

Eaton SC200 - Task 3 - Mount the EPS2;EPS5 in the Rack

Eaton SC200
83 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Enterprise Power Solutions Installation and Operation Guide
18
Copyright © 2008 Eaton Corporation. All Rights Reserved.
IPN 997-00012-56C September 2008
"
Circuit breaker cover
#
Load circuit breaker (1 of 10 shown)
$
Circuit breaker blank covers (to cover
unused circuit breaker positions as
required)
Procedure complete
Task 3 - Mount the EPS2/EPS5 in the Rack
Step 1 - Check clearances
The EPS2/EPS5 requires the following clear space:
Front:
adequate space for access and ventilation for rectifiers-
600mm (24") minimum recommended.
Rear:
adequate space for ventilation and access to input and
output terminals, and battery connectors
Below:
adequate space for ventilation and to route wires
connected to the output terminals (recommended 1U
minimum).
No heat source greater than 50°C below the EPS2/EPS5.
Sides:
if required, adequate space for access to protective ground
terminal and telecom ground terminal.

Table of Contents

Other manuals for Eaton SC200

Related product manuals