Installation
Copyright © 2008 Eaton Corporation. All Rights Reserved.
IPN 997-00012-56C September 2008
19
Step 2 - Mount the EPS2/EPS5
1 Fit cage nuts to match the
screw holes in the rack
mounting brackets.
2 Attach the EPS2/EPS5 using
the rack mounting screws as
shown.
3 Tighten the screws.
Step 3 - Protective earthing conductor
The building installation shall provide a means for connection to protective
earth, and the EPS2/EPS5 is to be connected to that means:
1 A Service Person shall check whether or not the socket-outlets from
which the EPS2/EPS5 is to be powered provide a connection to the
building protective earth.
If this connection is provided then no further action is required.
2 If not, the Service Person shall arrange for the installation of a
Protective Earthing Conductor from the separate protective earthing
terminal to the protective earth wire in the building:
Connect a Protective Earthing Conductor to the chassis of the
EPS2/EPS5 as shown in the following diagram. Use:
Wire: Multi-strand, copper conductor, 8 AWG with
green/yellow insulation
Strip length: ½" (12mm)
Crimp lug: FCI-Burndy type YAV8C-L3
Crimp tool: FCI-Burndy type MY29-11
Tighten terminal to 36 in-lb (4Nm).
Terminate the Protective Earthing Conductor at a point connected
to the protective earth wire in the building.