Task 8 - Connect to the AC Supply Point
Step 1 - EPS2/EPS5 systems with IEC cord sets
If the EPS2/EPS5 has permanently connected ac cords then go to Step 2.
Connect one of the cord sets provided to each IEC connector on the rear of
the EPS2/EPS5.
If the cord sets are missing or must be replaced then refer to Spare Parts on
page
66 for replacement items.
Step 2 - Connect at the ac supply point
1 Check the ac supply point is isolated.
2 Connect the ac cords to the ac supply point.
3 Label the connection at the ac supply point.
4 Secure the cords to ensure there is no strain on the terminals.
Procedure complete
Do not switch on the ac supply at this stage.
Installation Completed
Installation of the EPS2/EPS5 is now complete. Follow the instructions in Start-Up on page
30 to make the system operational.