EasyManua.ls Logo

EC POWER XRGI 9 - Recommissioning

Default Icon
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
6.3. RECOMMISSIONING
Once all parts of the service kit have been replaced on the XRGI
®
system
and the latest software version has been played on all components, close
the Power Unit and reinstall the rear cover of the Power Unit.
Recommission the XRGI
®
system
by:
- Connecting the Q-Heat Distributor to the power supply.
- Opening the gas supply to the Power Unit.
- Switching on the XRGI
®
system on the iQ-Control Panel.
Q-Heat Distributor Gas valve Main switch
Fig. 6.36 Fig. 6.37 Fig. 6.38
35

Table of Contents

Other manuals for EC POWER XRGI 9

Related product manuals