MAINTENANCE INSTRUCTION
Improper service and maintenance work can affect the system function and cause damage! Installing non-approved components, as well
as unauthorized modifications and conversions, may affect safety and reduce warranty.
Only permit authorised EC POWER personnel to perform service and maintenance work.
Service and maintenance intervals must be observed.
Only original spare parts and approved equipment (such as engine oil and coolant) may be used.
The following work must be carried out with every maintenance:
Visual check
Scheduled maintenance
Preventive maintenance of the wear parts
In addition, it must be confirmed in the service booklet, whether the service work
and the component replacement has been completed.
Information on the service booklet:
Acknowledge the completed service work/inspection with a check mark.
Acknowledge the service work/inspection not completed with a minus mark.
Send a manual call to the EC POWER service database before and after
every maintenance.
Acknowledge every maintenance with a signature.
Maintenance is required after fixed intervals, to ensure that the XRGI
®
system always operates safely and reliably.
The maintenance interval display on the iQ-Control Panel display as well as in the EC POWER service database also indicates this date.
MAINTENANCE INTERVAL (Maintenance is performed after the following operating hours or no later than after 2 years):
XRGI
®
-TYPE / MAINTENANCE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
XRGI
®
6 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000 100.000
XRGI
®
9 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000 100.000
XRGI
®
15 8.500 17.000 25.500 34.000 42.500 51.000 59.500 68.000 76.500 85.000
XRGI
®
20 6.000 12.000 18.000 24.000 30.000 36.000 42.000 48.000 54.000 60.000
Any guarantee/warranty claims will be invalidated if maintenance is performed later than 200 operating hours after the recommended
maintenance interval.
Only use approved EC POWER spare parts and components. All guarantees and/or warranties provided will be invalidated if other com-
ponents and materials are used.
The following chapters describe the maintenance work. Follow the maintenance instructions step by step!
2. MAINTENANCE INSTRUCTION
Fig. 2.01