EasyManuals Logo

Edge-Core ECS3510-26P Installation Guide

Edge-Core ECS3510-26P
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
Chapter 2
| Installation Overview
Switch Installation Tasks
– 16 –
Connect AC Power to Power On
Connect the power cord to the AC socket on the switch and to a grounded, 3-pin,
AC power source.
Go to the chapter “Power and Grounding
Figure 4: Connecting AC Power
Verify Switch Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the PWR and DIAG LEDs should both be on green. If any
of the LEDs are on amber, see “Diagnosing LED Indicators” on page 46.
Go to the section “Understanding the System Status LEDs” on page 42
Task 3
Supplied AC Power cord. Connect an external AC power source
to the AC power socket of the switch
using the supplied AC power cord.
1
2
1
2
Task 4

Table of Contents

Other manuals for Edge-Core ECS3510-26P

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Edge-Core ECS3510-26P and is the answer not in the manual?

Edge-Core ECS3510-26P Specifications

General IconGeneral
BrandEdge-Core
ModelECS3510-26P
CategorySwitch
LanguageEnglish

Related product manuals