5. Commission the pump
T
o commission the pump:
1. Make sure that the voltage selecon is set to correct value required for the
applicaon. Refer to Figure: Voltage selecon plate.
2. Make sure that all openings to atmospheric pressure in the foreline vacuum system
are closed.
3. Connect the power cord.
4. Set the mains circuit breaker (Figure: nXRi pumps, (8)) to ON. Make sure that the
power indicator LED (Figure: Interface control panel, (14)) illuminates. If the LED
does not illuminate, contact us.
5. Press the start buon (Figure: Interface control panel, (1)) unl the run indicator
LED (Figure: Interface control panel, (13)) begins to ash.
6. When the dry pumping system starts and connues to operate, if an alarm
condion is indicated:
A. shut down the dry pumping system. Refer to Shut down the pump on page
35.
B. refer to Fault nding on page 42
C. if the problem has not been reced, contact us.
7. Aer you commission the dry pumping system:
A. to c
onnue to operate the system, refer to Start the pump on page 34.
B. to shut down the system, refer to Shut down the pump on page 35.
05/2021 - ©Edwards Limited
Page 25A90301880_C
A90301880_C - Commission the pump