EasyManua.ls Logo

Emerson X-STREAM Series

Emerson X-STREAM Series
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Emerson Process Management GmbH & Co. OHG 4-5
X-STREAM Non-Incendive
Instruction Manual
HASXENE-IM-EX
12/2014
4
Maintenance
The housing needs to be controlled on leaka-
ges with a pressure of 25 mbar (0.4 psig). The
following steps have to be provided:
Modify like described on Section 4.4.1.1
.
Supply a pressure of 25 mbar to the ana-
lyzer housing and take care of the ow
meter display.
The test is passed, if the measured value
does not exceed the following max. value:
Permissible ow: 3 l/min max.
4.4.1.2 Run Leakage Test
Fig. 4-1: Assembly for Check Routines
4.4 Checking Modi ed or Repaired Analyzers
4.4.1.3 Startup After Test Procedure
All modi cations described in Section 4.4.1.1
have to be cancelled.
Especially the gas ttings‘ tight assemblies
need to be checked.

Table of Contents

Related product manuals