2-Pack Analyzer System
22 4900002256 rev. B 4-13-21
Electrocutionhazard
1. Shut off power at the main disconnect external to the analyzer.
2. Open enclosure door.
If service must be performed with power engaged (gain adjustment, etc.):
Explosion hazard
Any work in a hazardous area must be carefully controlled to avoid creating any
possible ignition sources (e.g., heat, arcing, sparking, etc.). All tools must be
appropriate for the area and hazards present. Electrical connections must not
be made or broken with power applied to avoid arcing.
Complete this action before performing any service that requires
working near the main input power or disconnecting any wiring or
other electrical components.
Note any live electrical components and avoid any contact with
them.
Only use tools with a safety rating for protection against
accidental contact with voltage up to 1000 volts (IEC 900, ASTF-
F1505-04, VDE 0682/201).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Endress+Hauser SpectraSensors 2-Pack Analyzer System and is the answer not in the manual?

Endress+Hauser SpectraSensors 2-Pack Analyzer System Specifications

General IconGeneral
BrandEndress+Hauser
ModelSpectraSensors 2-Pack Analyzer System
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals