Hardware Installation and Maintenance Manual Index–1
INDEX
Numerics
4-20 mA current loop 3–11
A
Absorption profile 1–7
AC connection terminal block 3–7
Acetone B–3
Acetone-impenetrable gloves B–4
, B–7,
B–8, B–9, B–15
Alarm relays 3–13
, 3–15
Alarms
General Fault Alarm 3–12
, 3–13,
3–15, B–23, B–25
H
2
O/CO
2
Assignable Alarm 3–12, 3–15
High Concentration Alarm 3–15
Analyzer hood (optional) 3–4
Attenuation 1–6
B
Beer-Lambert absorption law 1–6
C
Cautions 1–1
Cleaning
Gas sampling lines B–1
Mirrors B–3
COM port B–29
, B–30
Connecting the control valve
source 3–22
Contamination B–1
Mirrors 1–8
Control system
Tracer 4–4
Current 1–7
Current loop 3–12
Receiver 3–14
, 3–16
D
DC systems 3–6
Detector 1–5
E
Electric traced tubing 4–3, 4–4
Electric tracer 4–4
Electrical noise B–1
, B–2
Enclosure
Electronics 3–4
H
2
O 3–11
H
2
O/CO
2
3–5, 3–7, 3–12, 3–14, 3–15
H
2
S 3–5, 3–6, 3–8, 3–11, 3–12, 3–13,
3–14, 3–16, 3–17
Heated 3–9
Enclosure heater 3–5
, 3–9
Erroneous readings 3–23
Excessive sampling gas pressure B–1
,
B–2, B–26
Excessive sampling gas
temperature B–1
, B–2, B–26
F
Faults
H
2
S
Concentra High Alarm 3–12
, 3–13
Laser Power Low Alrm B–3
, B–26,
B–27
New Scrubber Alarm B–23
Pressure High Alarm B–2
, B–27
Pressure Low Alarm B–2
, B–27
Temp High Alarm B–2
, B–27
Temp Low Alarm B–2
, B–27
PeakTk Restart Alarm B–2
Field pressure reducing station 4–3
, 4–4,
4–5, 4–8, 4–10
Start up 4–5
Flowmeter 4–10
, B–24
Bypass 4–6
, 4–9, 4–10
Sample 4–4, 4–6, 4–8
G
Gas leaks 3–21, 3–22, B–1, B–3
Gas sampling line B–3
Gas standard B–23
, B–25
Ground wire 3–8
, 3–10