EasyManua.ls Logo

EOS Vision - Starting the Heater

EOS Vision
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EOS Vision - Installation and Operating Instructions EN-37
Commissioning
Filling the rock store
1 Wash the stones under running water.
2 Stack each stone loosely leaving sufficient space between them.
There must be enough space between the stones so that convection
air can circulate sufficiently between them.
Fill the store with stones only to the upper edge.
Do not place the stones on the edge. The air must flow freely.
5.2 Starting the heater
A slight odour may be produced the first time the cabin is heated because
the heater is being heated for the first time. The odour ceases upon contin-
ued operation of the heater.
Switching the system on
1 Switch on the sauna heater at the control unit.
2 Use the control unit to select a suitable program.
5.3 Switching the heater on remotely
If you switch on the heater remotely, ensure that no objects are placed on
the heater. A suitable safety system, for example EOSafe D/L, can be used
to prevent this.

Related product manuals