EPSON Stylus C50/C60/C61/C62 Revision C
Disassembly and Assembly Overview 89
4.1.4  Work Completion Check
If any service is made to the printer, use the checklist shown below to confirm all 
works are completed properly and the printer is ready to be returned to the user.
Table 4-3.  Work Completion Check
Classifi-
cation
Item Check Point Status
Main Unit
Self-test Is the operation normal?
Checked
Not necessary
On-line Test Is the printing successful?
Checked
Not necessary
Printhead
Is ink discharged normally from 
all the nozzles?
Checked
Not necessary
Carriage 
Mechanism
Does it move smoothly?
Checked
Not necessary
Is there any abnormal noise 
during its operation?
Checked
Not necessary
Is there any dirt or foreign 
objects on the CR Guide Shaft?
Checked
Not necessary
Is the CR Motor at the correct 
temperature?
(Not too heated?)
Checked
Not necessary
Paper Feeding 
Mechanism
• Is paper advanced smoothly?
• No paper jamming?
• No paper skew?
• No multiple feeding?
• No abnormal noise?
Checked
Not necessary
Is the PF Motor at correct 
temperature?
Checked
Not necessary
Is the paper path free of any 
obstructions?
Checked
Not necessary
Adjustment
Specified 
Adjustment
Are all the adjustment done 
correctly?
Checked
Not necessary
Lubrication
Specified 
Lubrication
Are all the lubrication made at 
the specified points?
Checked
Not necessary
Is the amount of lubrication 
correct?
Checked
Not necessary
Function ROM Version Version:
Checked
Not necessary
Packing
Ink Cartridge
Are the ink cartridges installed 
correctly?
Checked
Not necessary
Protective 
Materials
Have all relevant protective 
materials been attached to the 
printer?
Checked
Not necessary
Others
Attachments, 
Accessories
Have all the relevant items been 
included in the package?
Checked
Not necessary
Table 4-3.  Work Completion Check
Classifi-
cation
Item Check Point Status