EasyManua.ls Logo

ESAB ES 150i - Post-Repair Inspection and Testing Protocol

ESAB ES 150i
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IN-SERVICE INSPECTION AND TESTING
0463 714 001
- 56 -
© ESAB AB 2020
1. Disconnect the power source from the mains supply.
WARNING!
Wait at least 5 minutes for the DC bus capacitor to discharge before
continuing.
After repair, inspection and test
After repair, inspection and test shall be carried out according to manufacturers instructions
and local regulations. The after repair, inspection and test consists of:
Visual inspection (see section "Visual inspection", page57)
Electrical test (see section "Electrical test", page58)
Functional test (see section "Functional test", page59)
The inspection and test shall be documented in a test report (see section "Test report",
page60)
A signed and dated label shall be attached to the equipment after an approved test.

Related product manuals