EasyManua.ls Logo

Escea EF5000 - Installation Checklist

Escea EF5000
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B
ACDEFGSERVICE
27
G
Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
□ Correctly sized cavity
□ Correct clearances to combustibles
□ An electrical isolating switch to the appliance, accessible after finished installation
□ Correctly sized gas supply with a pressure test point, ensuring adequate supply with all other
gas appliances in the dwelling running
□ Gas type conversion process carried out if required
□ A weather-tight 240V supply with the 240/24V transformer protected from the elements
□ The appliance fixed to the cavity
□ The appliance plugged into a mains electricity supply
□ All gas joints and pressure points leak tested with suitable leak detection solution and drop
tests completed on gas pipework
□ Fuel bed correctly installed
□ A fitted fascia
□ Operated the fire and verified that it lights reliably and safely
□ Data label marked up with correct gas type and dated by installer if converted during
installation
□ Home-owner shown how to operate the appliance correctly
□ Warranty card filled in with installer details and appliance serial number
□ User Guide made available for end user
□ Plumbing Industry Commission Compliance Certificate given to end user