Page 16
Gateway mounting operations
Check the GSM/UMTS signal strength through the green indicator
LED (see chapter “SIGNALS”, page 63) and identify an area where
the signal is strong enough.
Note: the signal strength may vary according to the
telephone provider.
Drill two holes with 5 mm diameter on the wall at a distance of 50
mm.
Insert the 2 wall plugs and screws down until the screws are at a 5
mm distance from the wall.
Place the gateway onto the two screws through the two back slots.