EasyManuals Logo

Esse-ti NEXT 3G User Manual

Default Icon
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
Page 16
Gateway mounting operations
Check the GSM/UMTS signal strength through the green indicator
LED (see chapter “SIGNALS”, page 63) and identify an area where
the signal is strong enough.
Note: the signal strength may vary according to the
telephone provider.
Drill two holes with 5 mm diameter on the wall at a distance of 50
mm.
Insert the 2 wall plugs and screws down until the screws are at a 5
mm distance from the wall.
Place the gateway onto the two screws through the two back slots.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Esse-ti NEXT 3G and is the answer not in the manual?

Esse-ti NEXT 3G Specifications

General IconGeneral
BrandEsse-ti
ModelNEXT 3G
CategoryReceiver
LanguageEnglish

Related product manuals