EasyManua.ls Logo

EST Centurion WS - Page 205

Default Icon
205 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Attach the swagelok nut on the line from the vent cutoff valve to the vent bulkhead on the
3000/3100 concentrator, refer to figure below.
6. Plug the Centurion Communication cable into the back of the Centurion, see Chapter 2 of
manual. Plug the 3000/3100 connection to the back of the 3000/3100, refer to picture
below. Plug the power cable to the Vent Cutoff valve, refer to picture above.

Related product manuals