10
11
12
B614 19 532297 - Rev.D
19
50 Nm
4.3 INSTALLING THE BARRIER BODY
F
Always perform the work with the power supply
disconnected.
!
Before you start, make sure that the plinth's concrete
has solidified.
In this phase the barrier must be locked.
Never handle the barrier by holding the control
board support.
1. (10) Remove the 4 nuts with washers from
the plate
2. (11) Place the barrier body on the foundation,
at the four mounting holes.
!
Be careful not to damage the electrical cable conduits.
3. (12) Fix the body of the barrier in position using
a nut with washer on every bolt of the foundation.
!
Use the torque wrench to tighten to the torque shown
in the figure.