EasyManua.ls Logo

Faraone ZP8 - Page 32

Faraone ZP8
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USE AND MAINTENANCE MANUAL - SECTION 3
AERIAL PLATFORM ZP – Rev. 05_2018
Page 3-6
INSERTION OF 4 STABILISER FEET
ATTENTION
THE MACHINE IS WITHOUT AN AUTOMATIC BASE LEVELLING VERIFICATION
SYSTEM. BEFORE PROCEEDING WITH THE ASCENT/DESCENT PHASE,
VERIFY CORRECT INCLINATION OF THE BASE BY VISUALLY CHECKING THE
SPIRIT LEVELS.
THE SPIRIT LEVELS MUST BE CENTRAL COMPARED TO THE INDICATOR,
WITHIN THE TOLERANCE LIMITS.
1
4
3
2

Table of Contents