Chapter 4 Installation
PAGE 4-13
[Output Signals]
When an output signal is “ON,” the voltage at the corresponding output terminal is at the same level as
the output common voltage (0V).
As shown below, the output signal at each terminal takes on one of two meanings in accordance with the
combination with the BANK SELECT signal (output bank).
MANREV / RELAY CONTACT-1 SIGNAL PIN No.: TB2-7 OUT-8
RELAY CONTACT –COM SIGNAL PIN No.: TB2-10
Turns ON by manually starting the reversed operation.
Turns OFF when the next fastening starts, or turns “OFF” at RESET, PROGRAM.
For details, refer to PAGE4-17 [MANREV signal timing chart]
RELAY CONTACT-2 SIGNAL PIN No.: TB2-8 OUT-9
RELAY CONTACT –COM SIGNAL PIN No.: TB2-10
Performs interlocking output of REJECT signal ON/OFF to external devices. (Click sound of the
operation switch is not output.)
Turns ON for 0.4 seconds by the BATCH OK signal rise-up.
Turns ON for 0.1 seconds by the QL OK signal rise-up.
RELAY CONTACT-3 SIGNAL PIN No.: TB2-9 OUT-10
RELAY CONTACT –COM SIGNAL PIN No.: TB2-10
OK is output when the fastening has been performed for the number of times specified by the cycle
count.
QL OK RELAY CONTACT-4 SIGNAL PIN No.: TB2-11 OUT-11
QL OK RELAY CONTACT-4 SIGNAL PIN No.: TB2-12 OUT-11
OK output for the QL signal
[QL OK] [BATCH OK] Timing Chart
D-No.540: Cycle count = 5
ACCEPT
QL OK
BATCH OK
D-No/COUNT
BATCH OK RESET