2. Commissioning
2-2
Festo P.BE-CTEU-EC-OP+MAINT-EN en 1208NH
Contents
2. Commissioning 2-1................................................
2.1 Configuration 2-3..................................................
2.1.1 Hot Connect functional i ty 2-3.................................
2.1.2 Registering participant properties (“ESI file”) in the configuration
program 2-3...............................................
2.1.3 Configuration of the operating modes 2-7.......................
2.1.4 Configuration of operating beha viour (target configuration) 2-13.....
2.1.5 Addressing and data access (data objects) 2-19...................
2.2 Replacing the device 2-21............................................
2.2.1 Replacing the bus node 2-21..................................
2.2.2 Replacing the I-port device – same device type (substitute) 2-22.....
2.2.3 Replacing the I-port device – different device type (replacement) 2-23.
2.2.4 Replacing the electrical connection box CAPC-… 2-24...............