EasyManua.ls Logo

Festo CTEU-EC - Page 59

Festo CTEU-EC
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Commissioning
2-25
Festo P.BE-CTEU-EC-OP+MAINT-EN en 1208NH
Procedure in tool change mode
1. Switch off the bus node power supply.
2. Remove the bus node from the electrical connection bo x
(Dismantling/Mounting: section 1.3).
3. Replace the electrical connecti o n box
For removal/installation of the electrical connection box,
follow the accompanying product documentation:
assembly instructions CAPC- F1-E - M12- D2
www.festo.com Suppor t por tal: enter search term,
e.g. “CAPC-F1-E-M12-D2” User documentati o n.
4. Mount the bus node on the new electrical connection box
(Dismantling/Mounting: section 1.3).
5. Switch the bus node power supply on again.
The bus node detects the connected I-port devices.

Table of Contents

Related product manuals