EasyManua.ls Logo

FJDynamics AT2 - Air Quality Requirements; Power Supply Requirements; Installation Tools; Unpacking and Inspection

FJDynamics AT2
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© FJDynamics. All rights reserved. 4
FJDynamics AT2 Auto Steer System Hardware Installation Manual
Unpack and check the items according to the following list.
2.4 Unpacking and Inspection
12 Electric drill / 1 Work with sleeves.
13 Tweezers / 1 Install the SIM card.
14 Ejector pin / 1 Install the SIM card.
15 Box cutter / 1 Unpack.
16 Scissors / 1 Cut cable ties.
17 Tape measure 5 m 1 Measure vehicle parameters.
18 Open-end
wrench
9/10 1 Spare part.
19 Extra-long box-
end wrench
11/13/14 1 Spare part.
No. Assembly Component Qty. Remarks
1
Electric
steering
wheel
Steering wheel 1
2 Steering motor 1 12 V/24 V
3
Small self-
sealing bag
Hexagon socket
head cap screw
M4×14
6
Install splined sleeves.
4 Spring washer M4 6
5 Plain washer M4 6
6
Control
terminal
Control terminal 1
7 Control terminal bracket 1
Fix the control terminal.
8 Control terminal mounting base 1
9 Nut 4
10 U-bolt 2

Related product manuals