Job Number:
Model/Serial Number:
Water Test:
Capacity Of Unit: Max: Per Regeneration:
Brine Tank Size:
Salt Setting per Regeneration:
Treated Water Capacity (Gallons/Liters)
Regeneration Day Override (Max Days Between Regen)
Regeneration Time (AM/PM)
Type of Timer (with Meter/without Meter)
Notes
Page 3
Job Specication Sheet