EasyManua.ls Logo

Fleck 7000 - Water Softener Control Valve; Water Pressure Requirements; Electrical Requirements; Installation Site Considerations

Fleck 7000
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Water Pressure
A minimum of 20 psi inlet water pressure is required for regeneration valve to operate effectively.
Electrical Facilities
An uninterrupted alternating current (A/C) supply is required. Make sure:
• Voltage supply is compatible with unit before installation.
• Current supply is always hot and cannot be turned off with another switch.
Existing Plumbing
Condition of existing plumbing should be free from lime and iron buildup. Replace piping that has heavy lime and/
or iron build-up. If piping is clogged with iron, install a separate iron lter unit ahead of the water softener.
Location of Softener and Drain
Locate the softener close to a clean working drain and connect according to local plumbing codes.
Bypass Valves
Always provide for the installation of a bypass valve if unit is not equipped with one.
Water Softener Control Valve
Page 
NOTE:
This product should be installed by qualied personnel.
Comply with all plumbing codes when installing this product.
Comply with all electrical codes when installing this product.
CAUTION
•Minimum water pressure 20psig.
•Maximum water pressure 125psig.
•Minimum water temperature 34° F.
•Maximum water temperature 110° F.
•Ambient temperature 34° to 122° F (1° to 50° C)
•Disconnect all power sources before servicing.
•Always operate with cover in place.

Other manuals for Fleck 7000

Related product manuals