EasyManua.ls Logo

Flintec FT-112 - Page 169

Flintec FT-112
170 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FT-112(D) Panel Weighing Indicator, Technical Manual, Rev.1.0.0, May 2019 Page 168 of 170
E76 QTY OVER 99
Up to 99 items can be totalized.
- Press enter key to finalize totalization
after printing.
- Press MRC key to delete totalization.
E78 NO PT RECORD
Preset tare memory error.
- PT is not entered or PT checksum
error.
- Enter PT.
- Call service
E80 VERIFY SCALE
Reverification the scale.
- Reverify the scale after checking the
scale hardware, load cells,
performance etc.
E81 CANNOT ADDR
DLC could not addressed.
- Check the DLC connection (RS-485 &
Power supply) hardware.
- Check the DLC and S/N.
E82 SHIFT ADJUST
Shift adjustment is not available
due to load cell coefficients are
out of limits.
- Check addressing is done correctly.
- Check test weight loading on
the correct DLC.
- Check the load cell installation and
scale installation.
E83 DLC COUNT ER
No regular response from load
cell
- Reenergize the indicator.
- Check the DLC connection (RS-485 &
Power supply).
- Change load cell.
E84 SN NOT MATCH
DLC yy
(1)
The address and S/N of the load
cell do not match.
- Check the DLC and S/N.
- Reenergize the indicator.
- Readdress the DLC.
E85 DLC TIMEOUT
DLC yy
(1)
Communication time out
- Check the DLC connection (RS-485 &
Power supply) hardware.
- Check the DLC and S/N.
E86 DLC COM ERR
DLC yy
(1)
Status error of load cell
- Change load cell.
E87 DLC UNDER
DLC yy
(1)
The DLC is under
- Check mechanical installation and
DLC.
E88 DLC OVER
DLC yy
(1)
The DLC is over
- Check mechanical installation and
DLC.
E89 DLC CHKSUM
DLC yy
(1)
Checksum error
- Check termination resistors.
- Check the DLC connection (RS-485 &
Power supply) hardware.
E90 DLC PWR ERR
Power supply of DLCs could not
detected.
- Check the main board.
E91 DLC SYSTEM
Internal communication error
between the DLC board and the
indicator.
- Change the DLC board.
- Change the main board.
E92 DLC UNMATCH
Capacity of the load cell is
different.
- Check capacity of the DLC
1) yy = Number/Address of the digital load cell.