Installing the pressure control valve (PCV) maintenance kit
Use this procedure when installing the HyPlex Prime pressure control valve maintenance kit. The complete service
schedule for the PCV is located on Page 26.
Every other time you install a Major Maintenance kit, you should also install the PCV Maintenance kit. The poppet,
seat, and static seal described in this procedure are included in the Major Maintenance kit.
Tools
Combination wrenches (11–32 mm)
1/2-in. torque wrench (0–100 ft-lb)
Screwdriver set
Allen wrench set
Needle nose pliers
6 in. soft jaw vise
Maintenance kit
PCV maintenance kit, 050625-1
Service notes
All parts of the kit should be installed at the same
time - do not replace components individually.
All components should be clean and free of debris
prior to assembly. Keeping the work area clean is im
-
portant while working on the equipment.
Read the entire procedure through before beginning
service, paying particular attention to safety instruc
-
tions.
CAUTION
Failure to follow these step-by step instructions could cause
premature parts failure or damage to the equipment.