EasyManuals Logo

Fluidwell E119-P Operation Manual

Fluidwell E119-P
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #43 background imageLoading...
Page #43 background image
Page 43
FW-E115-P-M_v0203_03_EN.docx
5 MAINTENANCE
5.1 GENERAL DIRECTIONS
Mounting, electrical installation, start-up and maintenance of the instrument may only be
carried out by trained personnel authorized by the operator of the facility. Personnel must
read and understand this Operating Manual before carrying out its instructions. Take
careful notice of the Safety rules, instructions and precautionary measures in the front of
this manual.
The E115-P may only be operated by personnel who are authorized and trained by the
operator of the facility. All instructions in this manual are to be observed.
Ensure that the measuring system is correctly wired up according to the wiring diagrams.
The housing may only be opened by trained personnel.
Take careful notice of the Safety rules, instructions and precautionary measures in the
front of this manual.
The E115-P does not require special maintenance unless it is used in low-temperature applications
or surroundings with high humidity (above 90% annual mean). It is the users responsibility to take all
precautions to dehumidify the internal atmosphere of the E115-P in such a way that no condensation
will occur, for example by placing dry silica-gel sachet in the casing just before closing it.
Furthermore, it is required to replace or dry the silica gel periodically as advised by the silica gel
supplier.
Due to incompatibility do not use silica gel in environments where Hydrogen fluoride, strong
acids and strong bases are to be expected.
Battery life-time
It is strongly advised to use only necessary functions.
E.g. disable analog output signal if not in use.
It is influenced by several issues :
Display update: fast display update uses significantly more power.
Pulse output.
Low temperatures; the available power will be less due to battery chemistry.
NPN and PNP inputs consume more energy than coil inputs.
High input frequency.
Communication.
Optical key activity.
Check periodically
The condition of the enclosure, cable glands and front panel.
The input/output wiring for reliability and aging symptoms.
The process accuracy. As a result of wear and tear, re-calibration of the flowmeter might be
necessary. Do not forget to re-enter any subsequent K-factor alterations.
The indication for low-battery.
Clean the enclosure with a lint-free cloth, soaked with a mild soap solution or fresh water.
5.2 INSTRUCTIONS FOR REPAIR
This product cannot be repaired by the user and must be replaced with an equivalent certified
product. Repairs are only allowed to be carried out by the manufacturer or his authorized agent.

Other manuals for Fluidwell E119-P

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fluidwell E119-P and is the answer not in the manual?

Fluidwell E119-P Specifications

General IconGeneral
BrandFluidwell
ModelE119-P
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals