Adjust and test boiler controls
1. &OLLOWINSTRUCTIONSINTHISMANUALTOSETANDVERIFYOPERATION
OFTHEBOILERCONTROLS
2. &OLLOWLOWWATERCUTOFFMANUFACTURERSINSTRUCTIONS
IF
USED
Have the following been done?
❏
Boiler and heat distribution units filled with water?
❏
Water chemistry verified per page 67?
❏
Sentinel X100 corrosion inhibitor added and water tested to
be within range?
❏
!IRPURGEDFROMSYSTEM
❏
!IRPURGEDFROMGASPIPING0IPINGCHECKEDFORLEAKS
❏
Condensate trap primed?
❏
)FBOILERHASBEENCONVERTEDTO,IQUElED0ETROLEUM,0'AS
ISPROPANECONVERSIONLABELAFlXEDTOJACKET
FreeStyle® boilers are shipped ready to fire natural
GAS/.,94OlREONPROPANEYOUMUSTFOLLOWTHE
instructions in this manual to install the propane
venturi. See page 12FORFreeStyle® 80, 120 or 155.
Failure to comply could result in severe personal
injury, death or substantial property damage.
❏
Thermostat circuit wiring checked to ensure there are no
stray voltages?
❏
Followed Operating Instructions, Figure 96, page 71?
❏
Burner flame and combustion verified per page 72?
❏
FreeStyle®CONTROLOPERATIONFORSPACEHEATINGAND$(7
IFUSEDVERIlEDPERTHISMANUAL
❏
!DDITIONALFIELDINSTALLED CONTROLSTESTEDAS OUTLINED BY
CONTROLMANUFACTURERS"OILER SHOULD BE OPERATING AND
SHOULDGOOFFWHENCONTROLSARETESTED6ERIFYCONTROLSCAUSE
automatic reset lockout or manual reset lockout as desired.)
❏
!DDITIONALFIELDINSTALLEDLIMITCONTROLSSETTO SYSTEM
temperature requirements? Balancing valves and controls
adjusted to provide design temperature to system?
❏
&LOWADJUSTEDBALANCEDFOR EACHZONEOFMULTIPLEZONES
systems?
❏
4HERMOSTATHEATANTICIPATORIFAVAILABLESETPROPERLY
❏
"OILERCYCLEDWITHTHERMOSTATSANDWITH$(7AQUASTATIF
installed) — Raised to highest setting and verified boiler goes
through normal startup cycle? Lowered to lowest setting and
VERIlEDBOILERGOESOFF
❏
Natural gas input measured? (page 72)
❏
Incoming gas pressure checked by connecting manometer to
GASVALVEAHEADOFBOILER'ASPRESSUREMUSTBEATLEASTTHE
minimum values given on page 16, with boiler operating at
high fire, and no more than 13 inches (330 mm) w.c. with
BOILEROPERATINGORBOILEROFF
❏
/BSERVEDSEVERALOPERATINGCYCLESFORPROPEROPERATION
❏
Room thermostats set to desired room temperature (and
$(7AQUASTATIFINSTALLEDTODESIRED$(7STORAGETEM-
perature)?
❏
!LLINSTRUCTIONSSHIPPEDWITHTHISBOILERREVIEWEDWITHOWNER
or maintenance person?
❏
)GNITIONSYSTEMSAFETYSHUTOFFDEVICETESTED
Before leaving:
❏
Fill in )NSTALLATIONCERTIlCATE, page 128.
❏
Return instructions to envelope and give to owner.
Fill out start-up data on the In-
stallation and Service Certificate,
page 128.