EasyManuals Logo

Friedrich FPHSR36A3B User Manual

Friedrich FPHSR36A3B
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
36 PB
INSTALLATION
Leak Check, Evacuation, and Charging (Triple Evacuation)
Friedrich requires all installations are Leak Checked and Evacuated in accordance to the “triple evacuation” process. This
process promotes a dry tight refrigeration system before opening the service valves. It recommended that a single port
refrigeration manifold and hoses rated over 31.5psi be used. Refrigeration hose valves, along with a vacuum pump and
micron gauge, must be used to ensure the system can be vacuumed and held under 500 microns. Check all equipment and
hoses for proper usage and leaks before beginning.
1. 1st Nitrogen Pressure Test:
Ensure all refrigeration connections are properly ared, secured, and torqued to their respective settings.
Pressurize the system with nitrogen to 550psi. Soap all connections with an approved refrigerant leak detection
solution.
The pressure in the system must hold for one hour respective to the environmental conditions and should not vary
less than 540psi. If pressure can not be adequate held, check integrity of ares and torque specications. Once
pressure is held adequately, purge the nitrogen charge to system pressure of 5‑10psi. DO NOT RETURN TO
ATMOSPHERIC PRESSURE.
2. 1st Vacuum Micron Test:
Connect hoses and vacuum pump to the outdoor unit as shown in Fig. 436. Start the vacuum pump and vacuum to
1000 microns. Close the valve to the vacuum pump and check for micron rise for 15 minutes. If microns rise to near
atmospheric pressure, there is a potential leak; repeat step 1. If microns rise over 5000, the system is very wet and
will require further nitrogen purges.
3. 2nd Nitrogen Break:
Once the system holds below 5000 microns, reconnect the nitrogen tank break the system vacuum with 30‑50psi of
nitrogen. Wait 5 minutes, then purge to 5‑10psi. DO NOT RETURN TO ATMOSPHERIC PRESSURE.
4. 2nd Vacuum Micron Test:
Reconnect vacuum pump and gauge and begin evacuation. Vacuum system to 500 microns. Close vacuum valve
and check for micron rise. Vacuum should hold under 1000 microns. Repeat steps 3 and 4 until achieved.
5. 3rd Nitrogen Break:
Once the system holds below 1000 microns, reconnect the nitrogen tank break the system vacuum with 30‑50psi of
nitrogen. Wait 5 minutes, then purge to 5‑10psi. DO NOT RETURN TO ATMOSPHERIC PRESSURE.
6. 3rd Final Vacuum Micron Test:
Reconnect vacuum pump and gauge and begin evacuation. Vacuum system to 300 microns. Close vacuum valve
and check for micron rise. Vacuum should hold under 500 microns. Repeat steps 3 and 4 until achieved. Once held
under 500 microns, the system is considered dry and tight.
7. Charging the system:
Unscrew Service Valve Caps to expose the inner hexagon head. Use an allen‑head spanner or service wrench with
appropriate adapter to release the refrigerant into the system. If the calculated line set length is over 24.5 ft, weight
in the additional charge with an approved refrigerant scale as needed. Refer to g. 437.

Table of Contents

Other manuals for Friedrich FPHSR36A3B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Friedrich FPHSR36A3B and is the answer not in the manual?

Friedrich FPHSR36A3B Specifications

General IconGeneral
BrandFriedrich
ModelFPHSR36A3B
CategoryAir Conditioner
LanguageEnglish

Related product manuals