EasyManua.ls Logo

Fuji Electric OPC-PRT - Page 67

Fuji Electric OPC-PRT
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66
change the data type to “INT array”.
When done, click “OK”.
4) Switch to online mode and download the project to the PLC. Verify that the newly-added inverter is
available and operating correctly by observing any indications shown on the inverter’s icon. W hen
the inverter’s icon is selected, its status and any available error messages will be displayed in the
area below the project tree. Also confirm that the interface cardsNetwork Status LED should be
solid green, indicating an “online/connected” state.
5) By double-clicking “Controller Tags” in the project tree, it is possible to view the newly-added tags.
The Interface_Card:I tag allows viewing of the input data, and the Interface_Card:O tag allows
modification of the output data. These tags will be synchronized with the inverter at whatever rate
was established for the module’s RPI. We can directly interact with these tags in order to control
and monitor the inverter. The AC/DC drive profile I/O data is described in section 9.2.6.

Table of Contents