EasyManua.ls Logo

Fujitsu Primergy BX900 S2 - Page 56

Fujitsu Primergy BX900 S2
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56 Operating Manual BX900S2
Hardware installation
© cognitas. Gesellschft für Technik-Dokumentation mbH 2012 Pfad: C:\Programme\FCT\tim_app\tim_local\work\WALTER\OBJ_DOKU-13569-001.fm
Ê Fasten the carrier rail at the lower end of the support bracket using three
centering screws (2).
Ê Position the carrier rail in the front left support upright.
Ê Fasten the carrier rail to the front support upright (3) using three M5 screws
including plugwashers.
Ê Repeat the operation for the right carrier rail. This rail does not require a
support bracket.
Figure 8: Position of the cage nuts
Ê Fit the cage nuts for securing the system unit in the corresponding catches
on the right and left support uprights.
1
5
10
15
20
25
13 13
27 27

Table of Contents

Other manuals for Fujitsu Primergy BX900 S2

Related product manuals