RX2520 M5 Operating Manual 47
● If the server/rack is intended for permanent connection to the mains
only an authorized specialist (electrician) is allowed to work.
Please follow the regulation of each country.
● If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the
power supply's fuse protection must comply with the requirements for
non-industrial power supply networks for the type A connector.
Other important information
● During cleaning, observe the instructions in the corresponding Operating
Manual chapter "Starting up and operation" > "Cleaning the server".
● Keep all manuals close to the server. All documentation must be included if
the equipment is passed on to a third party.
4.2 CE conformity
The system complies with the requirements of European
Regulations. Find the CE declaration on certificate portal:
https://sp.ts.fujitsu.com/sites/certificates/default.aspx
To open the CE declaration applicable for your system, proceed
as follows:
Ê Select Industry Standard Servers.
Ê Select your model, e.g. Rack server.
Ê Select your system, e.g. PRIMERGY RX2530 M1.
Ê Select CE Cert <your system>.
V CAUTION!
This is a Class A product. In a domestic environment this
product may cause RF interference, in which case the
user may be required to take adequate measures.