POST INSTALLATION - 3
Fulton Ltd
3.1 GAS PURGE
A purge of the gas lines must be carried out to remove air (oxygen) from the pipework and to
ensure the pipework is flooded with gas.
3.2 PIPEWORK LEAK/PRESSURE TESTS
Upon completion of the installation, adhere to the following for system piping testing:
1.
Perform a suitable soundness test on all pipework.
2.
Perform Leak Detection Fluid (LDF) tests at all welds and joints to ensure that the system is free
fro
m leaks.
3.3 ELECTRICAL INSTALLATION TESTING
Earth bond test
Tighten electric terminals
3.4 FINAL INSTALLATION INSPECTION
Ventilation to relevant standards
Gas Supply supported by Test and Purge Certificate
Flue System supported by Smoke test and Manufacturers Certificate
All installation pipework correctly sized, connected and supported.
VSRT-IOMM-2019-1
Page 29