6.8.3 MONTHLY IN ADDITION
Note: Must be carried out after 1
ST
Month following commissioning.
Ensure the main electrical supply is isolated before starting work.
9.
Visually inspect the internal water space (see Section6.6).
10.
Visually inspect the flanged joint covering the rear inspection port in which the blowdown
valve is fitted, if any leakage is evident, the gasket needs replacing.
11.
Clean any water traps and strainers fitted in the feedwater line.
Check feedwater and boiler water quality against the values given in Appendix A - TI-139-
Recommended Water Conditions.
Note: Use only genuine Fulton replacement parts.