EasyManua.ls Logo

Gas Data GFM436 - Snap Head System; Checking and Factory Inspections

Default Icon
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9ENG8008 GFM436 User Manual
Appendix C – Vane Anemometer- 85
18.5.4 Snap Head
The snap head fixing system renders it very simple to fit a new impeller to the flow probe: this saves costly non-
productive time and in the event of damage to the snap-head enables the operator to have the probe back in
service in a matter of seconds by simply changing the snap-head.
18.5.5 Checking/factory inspections
Depending on the application and the loads on the instrument we consider it highly advisable to have the probe
annually checked or inspected/repaired at our factory.

Table of Contents

Related product manuals