7. UPGRADE INFORMATION
ServerID upgrade
Upgrade package1
Upgrade package2
Upgrade should be applied on Upgrade
estimated total time
upgrade-serverID_Axxxxx…tgz.enc
upgrade-SX2000AR-step2-
[YYYYMMDD].tgz.enc
upgrade-SX2000AR-buildxx-
[YYYYMMDD]
-incr.tgz.enc
7.81 to 7.83
15 to 20 mins
7.1 Note on the sha256 Certificate
After upgrading SX-2001/SA-2100(A/T) to SX-2000(A/T)R for HFR IMB, the server sha256
certificate will be updated so new KDMs must be issued with the updated sha256 certificate.
Previous KDMs (before upgrade) issued for this server may not be seen for ingest on
Content Manager.
8. UPGRADE PROCEDURE
8.1 Run the ServerID Upgrade
“ServerID upgrade” prepares your server for the DCI software upgrade and MUST
run before running the main upgrade.
The following upgrade package must run based on your serial number:
A00000 – A00999
A01000 – A01999
A20000 – A20999
upgrade-serverID_A00xxx…tgz.enc
upgrade-serverID_A01xxx…tgz.enc
upgrade-serverID_A20xxx…tgz.enc