EasyManua.ls Logo

GE AKTA GO - Page 16

GE AKTA GO
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Restart after emergency
shutdown or power failure
Follow the steps below to restart the system after an emergency shutdown or power
failure.
ActionStep
Reconnect the power cord.1
Start the instrument by pressing the On/Off button on the instrument control
panel.
2
Start the computer and the UNICORN software.3
Re-establish connection between UNICORN and the instrument.4
If the run has been aborted, recover or discard remaining sample and flush
the flow path as appropriate.
5
16 ÄKTA go Operating Instructions 29360951 AC
2 Safety instructions
2.3 Emergency procedures

Table of Contents

Related product manuals