EasyManua.ls Logo

GE AKTA GO - 6.3 Start a Method Run

GE AKTA GO
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3 Start a method run
Prerequisites
Make sure that the system is correctly prepared. Confirm the following:
The sample inlet is primed or the sample loop is loaded.
The column is properly connected.
The pressure alarm has an appropriate limit set.
That there is no air in the system.
The buffer inlet tubing(s) is immersed in correct buffer vessels.
All waste tubing is immersed in appropriate waste vessels that have sufficient empty
volume.
No tubing is twisted and the flow path is free from leakage.
If a Fraction collector is being used, that the correct tubes are used and loaded.
Start a method run
Follow the steps below to start the method run.
ActionStep
Open the System Control module and click the button Open Method Navi-
gator.
1
Select the method to run, and click the Run button.2
Step through the displayed pages in the Start Protocol, add requested input
and make appropriate changes if necessary. Click Next.
3
Click Start on the last page of the Start Protocol.4
84 ÄKTA go Operating Instructions 29360951 AC
6 Run a method
6.3 Start a method run

Table of Contents

Related product manuals