4.1.6 Required materials
Introduction
This section describes the materials required for the installation and operation of the
ÄKTA go instrument.
Solutions
The solutions listed in the following table are required during the installation procedure
and should be provided at the installation site.
Scope of useRequired volumeBuffer/solution
System test, Pump test, and Mixer
test
1 LDistilled water
If applicable, Fraction Collector
F9-R test, and/or Column Valve
V9-C test
System test and Mixer test1 L1.0% acetone and 1.0 M
NaCl in distilled water
Priming of the pump rinsing sys-
tem
150 mL20% ethanol in distilled
water