EasyManuals Logo

GE AKTA GO User Manual

GE AKTA GO
117 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
4.1.6 Required materials
Introduction
This section describes the materials required for the installation and operation of the
ÄKTA go instrument.
Solutions
The solutions listed in the following table are required during the installation procedure
and should be provided at the installation site.
Scope of useRequired volumeBuffer/solution
System test, Pump test, and Mixer
test
1 LDistilled water
If applicable, Fraction Collector
F9-R test, and/or Column Valve
V9-C test
System test and Mixer test1 L1.0% acetone and 1.0 M
NaCl in distilled water
Priming of the pump rinsing sys-
tem
150 mL20% ethanol in distilled
water
ÄKTA go Operating Instructions 29360951 AC 41
4 Installation
4.1 Site preparation
4.1.6 Required materials

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTA GO and is the answer not in the manual?

GE AKTA GO Specifications

General IconGeneral
BrandGE
ModelAKTA GO
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals