EasyManua.ls Logo

GE AKTA pilot 600 - Page 78

GE AKTA pilot 600
140 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the New Method dialog box, select Intelligent Packing from the Predefined
Method list. Click OK.
2
Result: A new method based on the predefined Intelligent Packing method
is created and opened.
Verify the method settings. Make sure that Column position and Default
curve to show are correct.
3
Tip:
For information about the settings, click on the Phase Properties tab and
then press F1.
Note:
Text editing in Method Settings or the Intelligent Packing phase of an intel-
ligent packing method is not recommended.
Click on the Intelligent Packing phase.4
78 ÄKTA pilot 600 User Manual 29274559 AA
4 Operation
4.3 Intelligent packing

Related product manuals