EasyManua.ls Logo

GE Druck DPI 615 IS

GE Druck DPI 615 IS
95 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
K0430 Issue No. 2 16
Leak Test (LEAK TEST) Task
A - External pressure source B - Pressure regulator C - Device/system under test
If required, use the INPUT key to change pressure units.
Set-up the leak test WAIT and DURATION times to the required values as shown
below. A minimum wait period of 3 minutes is recommended.
Close the vent valve and pressurize the device/system to the required LEAK TEST
pressure.
•Press the RUN (F2) key to start the leak test. When completed, the beeper sounds
and the leak test results are written to the display.
A
B
PRESSURE INT
bar
F2F1
RUN
CHANGE
VALUE
WAIT
DURATION
START PRESS
STOP PRESS
PRESS CHANGE
LEAK RATE
secs
secs
bar
bar
bar
bar/m
60
60
max 30V
TASK : LEAK TEST
SNAPSHOT MODE
DPI 615 IS
C
Taking Measurements
Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176
TestEquipmentDepot.com

Table of Contents

Related product manuals