EasyManua.ls Logo

GE H45601VG - Page 119

GE H45601VG
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
IRECTION 5813707-100, REVISION 2 VENUE GO™ SERVICE MANUAL
Chapter 3 - System Setup 3-45
PRELIMINARY
2) Select Check (2) to start the verification process of the connection to the device.
The verification process takes some time to run.
A sign is displayed next to the Check button, indicating if the passed or failed .
NOTE: If the Check button fails immediately, the AE Title is probably wrong. If the Check button fails after a
long time (corresponding to the timeout), the IP address or Port Number is probably wrong.
3-8-4-5 DICOM Storage Setup
The application supports connectivity of up to two DICOM servers.
1) In the Dataflow menu, slide the DICOM Storage 1 On/Off slider to On.
2) Tap to select DICOM storage and to display the DICOM Storage properties screen.
Figure 3-27 Select DICOM Storage
3) If Direct Store is enabled, the image will go to the DICOM server immediately after it is acquired.
You will need to verify that the DICOM server is capable of keeping the connection open for the
time it takes to complete an examination.

Table of Contents

Related product manuals