General Ultrasound system requirements
LOGIQ V3/V5/V5 Expert – Basic Service Manual                 2-7
5726264-100 English Rev.8
2-2-3-4 Site circuit breaker
It is recommended that the branch circuit breaker for the 
Ultrasound system be readily accessible.
2-2-3-5 Site power outlets
A dedicated AC power outlet must be within reach of the 
Ultrasound system without extension cords. Other outlets 
adequate for the external peripherals, medical and test 
equipment needed to support this Ultrasound system must also 
be present within 1 m (3.2 ft.) of the Ultrasound system. 
Electrical installation must meet all current local, state, and 
national electrical codes.
2-2-3-6 Unit power plug
If the Ultrasound system arrives without a power plug, or with 
the wrong plug, you must contact your GE dealer or the 
installation engineer must supply what is locally required.
POWER OUTAGE MAY OCCURE. 
The LOGIQ V3/V5/V5 Expert requires a dedicated single 
branch circuit. To avoid circuit overload and possible loss of 
critical care equipment, make sure you DO NOT have any 
other equipment operating on the same circuit.