2.2 Unpacking the Goods 622
2.3 Storing the Goods 622
2.4 Dismantling the Goods 622
3 Mounting the Device 623
3.1 Flush Panel Mounting 623
3.2 Rack Mounting 624
4 Cables and Connectors 626
4.1 Terminal Blocks 626
4.2 Power Supply Connections 627
4.3 Earth Connnection 627
4.4 Current Transformers 627
4.5 Voltage Transformer Connections 628
4.6 Watchdog Connections 628
4.7 EIA(RS)485 and K-Bus Connections 628
4.8 IRIG-B Connection 628
4.9 Opto-input Connections 628
4.10 Output Relay Connections 628
4.11 Ethernet Metallic Connections 629
4.12 Ethernet Fibre Connections 629
4.13 RS232 connection 629
4.14 Download/Monitor Port 629
4.15 GPS Fibre Connection 629
4.16 Fibre Communication Connections 629
5 Case Dimensions 630
5.1 Case Dimensions 40TE 630
5.2 Case Dimensions 60TE 631
5.3 Case Dimensions 80TE 632
Chapter 25 Commissioning Instructions 633
1 Chapter Overview 635
2 General Guidelines 636
3 Commissioning Test Menu 637
3.1 Opto I/P Status Cell (Opto-input Status) 637
3.2 Relay O/P Status Cell (Relay Output Status) 637
3.3 Test Port Status Cell 637
3.4 Monitor Bit 1 to 8 Cells 637
3.5 Test Mode Cell 638
3.6 Test Pattern Cell 638
3.7 Contact Test Cell 638
3.8 Test LEDs Cell 638
3.9 Test Autoreclose Cell 638
3.10 Static Test Mode 639
3.11 Loopback Mode 639
3.12 IM64 Test Pattern 640
3.13 IM64 Test Mode 640
3.14 Red and Green LED Status Cells 640
3.15 Using a Monitor Port Test Box 640
4 Commissioning Equipment 641
4.1 Recommended Commissioning Equipment 641
4.2 Essential Commissioning Equipment 641
4.3 Advisory Test Equipment 642
5 Product Checks 643
5.1 Product Checks with the IED De-energised 643
5.1.1 Visual Inspection 644
5.1.2 Current Transformer Shorting Contacts 644
5.1.3 Insulation 644
P543i/P545i Contents