CHAPTER 3: MECHANICAL INSTALLATION DIN INSTALLATION STEPS
EPM 2200 POWER METER – INSTRUCTION MANUAL 3–3
4. Secure from back of panel with lock washer and nut on each threaded rod.
Use a small wrench to tighten. Do not overtighten. The maximum installation
torque is 0.4 Newton-Meter.
Figure 3-2: ANSI Mounting Procedure
3.3 DIN Installation Steps
1. Slide meter with NEMA 12 Mounting Gasket into panel. (Remove ANSI Studs, if
in place.)
2. From back of panel, slide 2 DIN Mounting Brackets into grooves in top and
bottom of meter housing. Snap into place.
3. Secure meter to panel with lock washer and a #8 screw through each of the 2
mounting brackets. Tighten with a #2 Phillips screwdriver. Do not overtighten.
The maximum installation torque is 0.4 Newton-Meter.
NEMA12 mounting
gasket
threaded rods
lock washer
and nut